Triangles: 699.4k
Vertices: 350.5k
More model informationA plugged and abandoned wellhead. Part of a decommissioning operation offshore for the oil and gas sector.
Wells once drilled and tested sometimes are not profitable to be used or are unstable. The protruding stub needs to be removed to conform with local/national/international standards. This can be done by a number of different methods.
Comments