ES - Canal de drenaje de la calzada romana ITER 34 excavado parcialmente en el yacimiento de Arrojeta-ITER 34 (Iruña de Oca, Álava) en 2023. Se identificaron dos, uno original y uno reexcavado, de planta rectangular, trazado casi recto y paralelos a la calzada. El segundo canal, más profundo, se realizaó tras la amortización del primero. Se conservaban al menos 71 m de canal. Se construyeron al norte, donde se sitúa el río y se dan las crecidas que suele tener.
EN - Drainage channel of the Roman road ITER 34, partially excavated at the Arrojeta-ITER 34 site (Iruña de Oca, Álava) in 2023. Two channels were identified: one original and one re-excavated. They are rectangular, almost straight, and parallel to the road. The second, deeper channel was created after the first one was filled. At least 71 m of canal were preserved. They were built to the north, where the river is located and where the floods usually happen.
Trabajos arqueológicos, fotogrametría y 3D: Qark
Comments