Hidroituango hydroelectric power plant 110720183D ModelNoAI
** FlyingWorks **
Accurate information from above
Who wants to be under Hidroituango’s shower?
Second, third and fourth spillway gates opened 11072018
The biggest hydroelectric project in the history of Colombia, located in western Colombia, in the department of Antioquia, will have a height of 220m and will create a large 70 km long water mirror by the Cauca River, second largest in Colombia. The engine room will have eight turbines, 300 MWh each one capable of generating 2,400 MWh at full capacity.
Nowadays, due the emergency, defying huge engineering challenges.
Location: Municipalities of Briceño, Ituango and Toledo (Antioquia).
This is the first #VR #3D public and independent digital reconstruction known so far by 11072018.
- Secure payment
- Support from sellers
- Access to future versions
StandardStandard
jpg(1)
30MB