Period of service: 2004~ Scheduled to be built: 66
Full length: 114.90 m Full width: 10.36 m Waterline: 9.3 m
Drainage quantity - Water: 6,950 t - Underwater: 7,900 tons
Power - Method: Nuclear power - Engine: - General Electric S9G pressurized water reactor (210 MW thermal) 1 unit - Caterpillar model 3512B V-12 auxiliary generator - a pump jet propeller - Propulsion 40,000 SHP
Maximum speed: 25 knots or more Submarine depth: 240 m to 490 m HULL MATERIAL: HY 130 HIGH TENSILE STEEL Flight attendants: 132
Armed: - MK.68 533 mm torpedo tube - Mk.48 ADCAP/CBASS Heavy Torpedo - AN/BLQ-11 LMRS UUV - UGM-109 Tomahawk - UGM-84 Half - Mk.49/57/60 Mine - Mk.45 VLS - Virginia Payload Tube - Virginia Payload Module - UGM-109 Tomahawk
This time, I made USS Virginia. It’s the newest submarine in the U.S. Submarines don’t seem to take much time to build. It took a total of eight days, starting on January 2nd. What kind of warship should I build next…
CC AttributionCreative Commons Attribution
2 comments