Triangles: 547.9k
Vertices: 275.1k
More model information** FlyingWorks **
Accurate information from above
Downstream north side 05252018
The biggest hydroelectric project in the history of Colombia, located in western Colombia, in the department of Antioquia, will have a height of 220m and will create a large 70 km long water mirror by the Cauca River, second largest in Colombia. The engine room will have eight turbines, 300 MWh each one capable of generating 2,400 MWh at full capacity.
Location: Municipalities of Briceño, Ituango and Toledo (Antioquia).
This is the first #VR #3D public digital reconstruction known so far by 05252018, at this time the crest of the dam has reached more than 410m (1345ft) [amsl], will it be possible to regain control of the project?
Comments